Home : Media : Photos
Japanese contractors conduct routine maintenance on the airfield at Misawa Air Base, Japan, May 18, 2017. The runway become fully operational June 26, more than a week ahead of schedule. This gave the 13th and 14th Fighter Squadrons along with 35th Maintenance Group personnel the opportunity to relocate and train with other Pacific Air Forces squadrons and integrate the 35th Fighter Wing mission in various locations.
170518-F-ZZ999-014.JPG Photo By: Staff Sgt. Melanie Hutto

MISAWA AIR BASE, Japan - Japanese contractors conduct routine maintenance on the airfield at Misawa Air Base, Japan, May 18, 2017. The runway become fully operational June 26, more than a week ahead of schedule. This gave the 13th and 14th Fighter Squadrons along with 35th Maintenance Group personnel the opportunity to relocate and train with other Pacific Air Forces squadrons and integrate the 35th Fighter Wing mission in various locations.


DOWNLOAD PHOTO (2.19 MB)


This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at http://www.dimoc.mil/resources/limitations.html , which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.



Back to Gallery